TitleDescriptionKeywordsGeneratorRobots

Welcome to Thobaity Office:: Drilling water wells, Hydrology studies, Water studies

Western Coastal Project

Western Coastal Project

A total of approximately 4,570 meters of drilling is included in this scope of work and will result in approximately 45 wells.Each location will be drilled, logged, constructed, and tested according to the specifications herein. The locations are shown in Attachment 7 along with a table. Central Zone drilling sites are cleared for work, but a small number may require confirmation of access rights and permissions. Northern Zone drilling sites will be cleared in the near future.